Independent attendance at the point that matters
Route reconnaissance for heavy or oversized project cargo, focused on access constraints, physical limitations and transport risk points.
The survey scope should be agreed in advance so the attendance focuses on the operational or claims question that needs to be answered. Where specialist engineering, class, statutory or laboratory input is required, that should be arranged separately from the field survey.
